TWO
EFFECT FALLING FILM MILK EVAPORATING PLANT
A.
Technical Specification & Operating Parameters
Product
|
Skim milk
|
Feed Rate
|
2600 Kg/hr
|
Feed Temp
|
5 to10°C
|
Initial Solid
|
8 %
|
Final Solid
|
45%
|
Concentrate rate
|
450 Kg/hr
|
Water Evaporations
|
2150 kg/h
|
|
|
|
|
Holding Time
|
10-15
secs
|
Concentrate
Temp
|
48°C
|
Steam consumption for TVR
|
475Kg/hr @ 8 bar
|
Steam consumption for high heater
|
125Kg/hr @ 3 bar
|
Installed Load
|
Kw
|
Average Power load
|
Kw
|
Cooling
water Temp.
|
32°C /40°C
|
Cooling Water
|
30 m3/hr
|
Compressed Air
|
Air at 8 Bar (Nominal)
|
B. Electrical Load Data
Sheet
Pumps
|
Power
load (Kw)
|
Feed Pump
|
2.2 Kw
|
|
|
|
1.1 Kw x 2
|
|
1.1 Kw x 1
|
Cal03
|
1.1 kw x2
|
Vacuum Pump
|
5.6 Kw
|
Condensate pump
|
1.1 Kw
|
Cooling water pump
|
3.7 Kw x2
|
Total
|
22 Kw
|
|
|
C.
Scope of Supply
S.
No.
|
Equipments
|
Quantity
|
1
|
Feed
Balance Tank
Capacity: 300 Ltrs.
MOC: SS 304
It will be fabricated from stainless steel conforming to AISI 304 quality. It will be supported on 3 No. S. S. legs
& adjustable ball feet. It will
further comprise of inlets for concentrated product, concentrated product of
the sampling line and one number outlet connection for product complete with
union.
|
01 No.
|
2
|
Inline
Filter
Cap: Matching with feed rate
MOC: SS 304.
This filters the foreign material.
|
01 No.
|
3
|
Feed
pump
Cap: Mentioned in Electrical load data sheet
|
01 No.
|
4
|
Preheater
TYPE: Coil type
M.O.C: SS 304
The preheaters will utilize the vapors from the Evaporating plant and
will be suitable for heating the milk from 6º C to 65ºC.
|
02 Nos.
|
5
|
High-heater
TYPE: shell & tube l type
M.O.C: SS 304
The high heaters will be
suitable for heating the milk from 65º C to 85ºC.
|
02 Nos.
|
6
|
Holding
tube assembly
To hold
milk on pasteurizing temp for 3 min
|
01 No.
|
7
|
|
|
8
|
Calandria
MOC: SS 304
All the Calandria will
be fabricated from stainless steel confirming to 304 quality. Around the evaporator tubes S. S. shell will
be provided with necessary connections for steam vapors, condensate outlet,
Air vent thermometer pockets etc. Calendria will be supported on the ground
floor. It will be Al cladded.
|
03 Nos.
|
9
|
Vapor Separator
M.O.C: SS 304
Each calandria will be connected to
the vapor separator. It will be fitted
with sight and light glass assembly, vacuum gauge, thermometer pockets with
thermometer, manhole, and cleaning nozzles. will be polished from inside to
150 grits & from outside to dairy finish.
|
03 Nos.
|
10
|
Intermediate Product
& Concentrate Transfer Pumps
To transfer product from one pass to
next within the same
Calendria or from one effect to
next.
|
One lot
|
11
|
Condenser
M.O.C: SS 304
Shell & tube type,
To
condense the vapor released from the vapor separators
|
01 No.
|
12
|
Vacuum pump
|
01 No.
|
13
|
Condensate Pump
|
01 No.
|
14
|
SS Pipes, Valves & Fittings
|
01 lot
|
15
|
Water balance Tank
MOC: SS 304
Cap; 100 lit
|
01 No.
|
16
|
Steam Pipes ‘C’ Class M.S.
From Header to TVR ASSEMBLY only
|
01 lot
|
17.
|
TVR
MOC: SS 304
|
01 No.
|
18.
|
Instrumentation
The
control panel shall comprise of the following:
a.
Main incoming SFU’s step down transformers.
Starters for all pumps & Vacuum
pumps.
b.
All panel mounted instruments.
c. Fault annunciators,
which shall be of Audio/Visual type.
Test- accept- reset type push buttons
shall be provided.
d.
A mimic diagram depicting the flow in the system.
e. Auto TVR
Control system shall be provided
f.
Auto high heater steam control
|
01 lot
|
19.
|
MCC Panel:
Low tension
switch board in totally weather and vermin proof sheet steel construction
(Powder coated), floor mounting and compartmental design, with bus bars
suitable for 3 phase, 415 volts, 50 cycles, 4 wire AC supply. Starter and
relays will be of ABB/Siemens/L&T make.
Incoming:
1No. Incoming feeder
with ammeter of suitable rating with nenecessary current transformer and
selector switch.
2
No. voltmeter with necessary selector switch
3 No. Indicating lamps.
Outgoing:
Switch gear for various motors
included in our scope in the plant.
Auxiliary contacts for alarm
annunciators
One 10 amp. Toggle switch and 10
amp. HRC fuse arrangement for 230 volts
AC supply for instrument panels.
|
01 lot
|
THREE STAGE
SPRAY DRYER
A.
Performance parameters for Dryer
Particulars
|
Skim milk
powder
|
Feed
Rate
|
465 Kg/hr
|
Temperature of Feed before Preheater
|
48
Deg C
|
Temperature of Feed after Preheater
|
75
Deg C
|
Feed solids
|
45%
|
Total
Water Evaporation
|
248
kg/hr
|
Powder
Production
|
217 Kg/hr
|
Powder
Moisture
|
3.5%
|
Inlet
Air Temp.
|
185
Deg C
|
Total
Steam for dryer
|
750 Kg/hr @ 14Bar
|
Total
steam for dehumidifier
|
100
Kg/hr
|
Chilled
Water (2—8) 0C
|
10
m3/hr
|
Total Power Installed (with high pressure atomizer)
|
60 Kw/hr
|
Total
power consumed
|
50
Kw/hr
|
NOTE:
1.
Temperatures
are indicative.
2.
Consumption
Figures and performance are valid with a tolerance of + 10 %.
3.
The
energy consumption figures are average for the production period.
B. Electrical Load
Data sheet
|
|
|
Feed
Pump
|
|
2.0
HP
|
Atomizer/High
pressure pump
|
|
25.0
HP
|
Supply
Fan
|
|
20.0
Hp
|
Exhaust
Fan
|
|
25.0
Hp
|
Rotary Valve/ Blow Through Valve
|
|
1
Hp X 3
|
Sifter
|
|
2.0
Hp
|
|
|
|
TOTAL
|
|
77 hp
|
C. Scope of Supply
S. No.
|
Equipments
|
Quantity
|
1.
|
Concentrate
Balance tank
MOC:
SS 304
Capacity –
300 Lit. The balance tank is vertical, UN-insulated, with conical
bottom and flat top. The tank is supported by legs with SS ball feet for
vertical adjustment in level up to 50 mm.
The
tank is complete with following accessories:
1
No. No foam inlet at top surface.
1
No. outlet SMS connection at tank bottom.
1
Set of semicircular removable top covers.
All inside welds to be ground smooth and internal surfaces
to be ground to sanitary finish.
|
01 No.
|
2.
|
Duplex
filter
MOC: SS 304
For filtering the product with valves & fittings.
|
01 No.
|
3.
|
Water
balance tank
Cap: 100 liters
MOC: SS 304
A water funnel is provided in feed
line for feeding water to the plant during starting / stopping operations.
|
01 No.
|
4.
|
Feed
pumping system
It will
comprise of the following
|
|
4.1
|
Feed
Pump
MOC: SS 304
|
01 No.
|
4.2
|
Feed
pre-heater system
MOC:
SS 304
For
preheating the feed product up to 75 Deg. C. temperature.
The
preheating system comprises of:
-Shell
& Tube pre-heater
-Steam valves, pipes & fittings
|
01 No.
|
4.3
|
Feed
pipes and fittings
MOC:
SS 304
To interconnect concentrate storage tanks, water tank and
feed pump with the Pressure atomizer and return line from atomizer for in
place of cleaning of the feed line.
The fittings will be of SMS.
|
01 No.
|
|
|
|
6.1
|
High
pressure feed pump
Suitable
high pressure feed pump with product contact parts SS304 easy for
cleaning. The pump shall be complete
with necessary motor. The feed rate to
the atomizer is varied by regulating the Pressure adjusting Valve mounted on
High Pr. Pump.
|
|
6.2
|
Nozzle
Atomizer
One set of nozzle atomizer complete with high-pressure
rubber pipe of food grade quality.
Swirl chamber, orifice plate and the other components of nozzle
assembly shall be supplied. The
atomizer shall be complete with high-pressure tubes, accessories and a set of
nozzles all assembled in an atomizer head i.e. fitted in the space provided
at the centre of the drying chamber.
|
01 No.
|
7.
|
Atomizer stand
For support of the atomizer during cleaning and
maintenance, A washing trough in SS with a drain is mounted on the support
for easy cleaning and maintenance of the atomizer
|
01 No.
|
8.
|
Drying chamber system
|
|
8.1
|
Air distributor
Placed
in the center of the chamber ceiling.
The Special designed construction gives a uniform distribution of the
air in the chamber and secures a well-defined air velocity profile around the
atomizer at a moderate pressure loss.
The air enters the chamber via a Vertical inlet duct .Air flow
direction is maintained vertically down co-current to feed by means of
special Wire Mesh. The air distributor hot air contact parts are made of
stainless steel.
|
01 No.
|
8.2
|
Drying Chamber
Made
of SS 304 with welded joints, outside bracing made of
structural
MS.
The
cylindrical chamber has conical bottom & a flat reinforced ceiling upon
which the air distributor is placed. The
part
of the chamber ceiling, which is in contact with the hot
air,
is cooled on order to prevent possible overheating of
powder
particles.
The
chamber consists of:
-Reinforced
chamber ceiling duly insulated & covered with
top
plate of the skid proof type of mild steel painted with an anti-corrosion
paint including kick plate.
-Cylindrical part with horizontal stiffeners of mild steel
welded
to the outside
of the cylinder
-Conical bottom with vertical and horizontal stiffeners of
mild
steel welded to the
cone.
-Light source for inside illumination.
-Access door in the cylindrical part.
The prefabricated chamber ceiling and bottom cone in
sections will be
supplied. Fabrication of chamber shell
and
assembly will be done at site. The chamber shall be
insulated & cladded with Aluminum sheets.
|
01 No.
|
8.3
|
Air outlet duct
MOC:
SS 304
Designed
to convey the drying air and the powder to the cyclone where the separation
of the powder will take place.
|
01 No.
|
9.
|
Cyclone separator
Designed
for highly efficient separation of the powder from the drying air. The separation of the powder from the air
occurs during a spiral movement inside the cyclone and the powder leaves the
cyclone at the bottom.
The
cyclone consists of:
-Tangential
inlet
-Cone
-Center
tube
-Cyclone
top with detachable cover for easy inspection and cleaning
The cyclone is made of Stainless Steel
AISI 304.
|
01 Nos.
|
10.
|
Blow through Valve
For
continuous discharge of powder from cyclone separator. The valve is of sanitary design.
The
rotary valve comprises of:
-
-SS Housing
-
-SS 304 rotor
-
-Solid stainless shaft
TEFC
drive motor with gearbox.
|
01 Nos.
|
11.
|
Fines
Recycle System
For transporting the fine fraction
of the powder to the wet atomization zone in the drying chamber by pneumatic
transport system. The system consists of:
|
|
11.1
|
Fines distributor
Installed
in the air distributor of the drying chamber, is made of AISI 304. The distributor introduces the fines around
the atomizer assembly. Air-cooling of
fines tubes prevents overheating of the powder when passing through the hot
air zone.
-fines
injection tubes
-cooling
jacket for the tubes
cooling
air supply (part of neck cooling system
|
01 No.
|
11.2
|
High pressure blower
For
supplying high-pressure air for transporting the fines to fines distributor
or External fluid bed.
-TEFC
motor
|
01 No.
|
11.3
|
Fines Return Pipe
Includes
a set of pipes to introduce the fines being blown from the blow through
rotary valves provided at the bottom of the cyclone separators, to the
following points. It consists of three
number deviator Joint to divert the fines to
-To
the wet zone in the nozzle spray area in the chamber
-To
the first drying section of the external fluid bed dryer
-To
cooler section of the external fluid bed dryer section
|
01 No.
|
11.4
|
Air ducts
MOC:
SS 304
From
cyclone to exhaust fan. Necessary transition pieces, flanges and gaskets,
etc. are included.
|
01 No.
|
12.1
|
Exhaust Fan
For
the exhaust air. The fan will be of the centrifugal type. It shall consists
of
-housing with inspection opening and drain
-Statically & dynamically balanced robust impeller of
self cleaning type.
-Shaft with heavy duty ball/roller bearings, grease
lubricated.
-TEFC Motor
-V-Belt drive with safety guard.
-Base
frame etc.
|
01 No.
|
12.2
|
Exhaust Chimney
In
MS Construction. The duct will lead the spent air from exhaust fan to
atmosphere. Necessary transition pieces, gaskets, flanges and air hood are
included. The chimney shall terminate at 1 M above building.
|
01 No.
|
13.
|
Integrated Fluidized bed dryer
|
|
13.1
|
Integrated Bed Fluidizing
Chamber
It shall be made of SS 304 & it
shall consist of single compartments
for drying . It shall have specially
designed perforated sheet so as to direct the hot air with powder flow. Also
it will have
Inspection doors : 02 Nos,
Hot Air inlet : 01 Nos.
|
01 No.
|
13.4
|
Air heating system
For indirect heating of the dehumidified supply air. The air heater is designed with special
attention to high thermal efficiency and a low pressure drop.
|
01 No.
|
13.5
|
Hot air duct
For conveying the air from the air heater to air
distributor. The duct
will be complete with transition pieces, flanges, packing,
hardware
and insulation supports. The duct will be made in
stainless steel
AISI 304 .
|
01 No.
|
14.
|
External fluid bed dryer
MOC: SS 304
Of vibrating type for continuous drying & cooling of
the powder.
The fluidized powder passes through the fluid bed in
crosscurrent flow with cooling air and is discharged by overflow at the
outlet weir. The cooling air and
drying air enter through the bottom of the perforated plate.
The perforated plate with directional holes has been
specially designed for easy emptying of fluid bed by opening of the outlet
weir. The upper part of the fluid bed
has been specially designed with larger cross sectional area, which effects
stabilization of the fluidization process and separation of fines from outlet
air.
The fluid bed consists of:
-Air distribution bottom part with cleaning doors
-Drain funnels
-Inlet air duct connections
-Perforated plate welded to a supporting frame
-Inclined powder inlet with a perforated plate at the
bottom
-Upper part housing with cleaning and inspection openings
-Air outlet
-Powder outlet
-Flexible connections for inlet and outlets
-Light source for internal illumination
-Vibro motors
-base frame with spiral springs
The
fluid bed is in sanitary design.
|
01 No.
|
15.
|
Hot air system for spray drying
chamber
|
|
15.1
|
Air intake filter
For the pre and fine filtration of drying air, comprising
Stainless steel housing and filter mats. Filter mats are made of special
fiber and washable.
|
01 No.
|
15.2
|
Delivery fan
Of the centrifugal type with fan and motor assembled on a
common
base frame and consisting of:
-housing with inspection opening and drain
-Impeller, statically and dynamically balanced
-Shaft with heavy duty ball/roller bearings, grease
lubricated
-Totally enclosed, fan cooled motor
-V-belt drive with safety guard
-Base frame with vibration dampers
-Flexible connections for air inlet and outlet
The
fan, including housing, impeller and base frame are made of painted carbon
steel with an anticorrosion paint. The
air quantity can be adjusted by means of a damper situated at the inlet of
the fan.
|
01 No.
|
15.3
|
Air duct
Including
necessary transition pieces, flanges and gaskets
connecting the
delivery fan and the air heater. The
duct is made of
galvanized
steel.
|
01 No.
|
15.4
|
Air heating system
For indirect heating of the supply air. The air heater is designed
with special attention to high thermal efficiency and a
low pressure
drop
The
air heater consists of:
-Steam
heating coil made of SS, Al fins
-SS
housing
-Necessary
connections complete with flanges
|
01 No.
|
15.5
|
Hot air duct
For conveying the air from the air heater to air
distributor. The duct
will be complete with transition pieces, flanges, packing,
hardware
and insulation supports.
The duct will be made in stainless steel
AISI 304. The steam
air heater shall be installed at atomizer level
and the length of the duct has accordingly been estimated
&
included.
Insulation and cladding will be done at site.
|
01 No.
|
16.
|
Hot air supply system for external
fluid bed
|
|
16.3
|
Air duct
Including
necessary transition pieces, bends, flanges and gaskets
connecting
the delivery fan and the dehumidifier battery. The duct
is
made of SS.
|
01 No.
|
16.4
|
Air Heater
For
indirect Heating of the supply air. The Air Heater is designed with special
attention to high efficiency and a low-pressure drop.
The
Heater consists of:
-Steam heating coil made of SS tube with Al fins
-SS housing with drip collection & drain
-Necessary connections complete with flanges.
|
01 set.
|
17.
|
Cool air supply system for external
fluid bed
|
|
17.3
|
Air duct
Including
necessary transition pieces bends flanges and gaskets connecting the delivery
fan and the dehumidifier battery. The
duct
is
made of SS.
|
01 set.
|
17.4
|
Dehumidifier battery
For
indirect chilling of the supply air, The dehumidifier is designed with
special attention to high cooling efficiency and a low-pressure drop.
The
dehumidifier consists of:
-Cooling coil made of SS tube with Aluminum fins
-SS housing with drip collection & drain
-Necessary
connections complete with flanges.
|
01 set
|
17.5
|
Air Heater
For
indirect Heating of the dehumified air from 11 deg C to 28 Deg C. The Air
Heater is designed with special attention to high efficiency and a
low-pressure drop.
The Heater
consists of:
-Steam
heating coil made of MS tube with MS Galvanized fins
-GI
housing with drip collection & drain
-Necessary connections complete with
flanges.
|
01 set
|
18.
|
Instrumentation
& control system
Instrument panel in S. S. & front plate of acryl in
which a flow sheet will be screen printed.
The instrument panel is pre-wired to terminal connections and complete
with following:
3 Nos Temp. Indicators, Range 0 to 200 Deg. C for the
following concentrate preheating temperature drying air inlet temperature
outlet air temperature.
3 Nos Temp. Indicators, Range 0 to 100 Deg. C for hot air
and cold air for FBD, Integrated bed
1 No Ammeter, for exhaust fan.
1 No Lockable key for control supply
1 Set Push buttons ON/OFF for motors with indication lamps
1 Set 24V, DC, 2A power supply for lighting
1 No. Auto temperature control for Hot air supply to main
chamber
1 No. auto temperature control for FBD heater.
1 No. auto temperature control for Integrated bed .
|
01 set.
|
19.
|
MCC Panel
Low
tension switch board in totally weather and vermin proof sheet steel
construction (Powder coated), floor mounting and compartmental design, with bus
bars suitable for 3 phase, 415 volts, 50 cycles, 4 wire AC supply. Starter
and relays will be of ABB/Siemens/L&T make.
Incoming:
1 No.
Incoming feeder with ammeter of suitable rating with necessary current
transformer and selector switch.
1 No. voltmeter with necessary selector
switch
3 No. Indicating lamps.
Outgoing:
Switch
gear for various motors included in our scope in the plant.
Auxiliary
contacts for alarm annunciators
One 10 amp. Toggle switch and 10 amp. HRC fuse arrangement for 230
volts AC supply for instrument panels.
|
01 set
|