Specification for Ion Exchange Plant


Specification for Ion Exchange Plant

  1. Feed to Ion Exchange Plant : 430 m3 per day,
  2. Feed concentration of whey : 17-18%, & 7.2 % ash /TS.
  3. De-mineralization of whey after NF:  35%.
  4. De-mineralization of whey after Ion Exchange : 90%.
  5. Possibility to allow C.I.P for all the product inlet and outlet pipes threw Ion Exchange from external source.
  6. All the valves and fittings should be of sanitary design and of reputed make.
  7. All the circulation & pressure pumps should be of reputed make & sanitary design.
  8. Control system should be Control room based, preferable PLC (S-7-400) with SCADA, Siemens, two number of PC for operation.
  9.  All the instruments should be of E& H or equivalent make.
  10.  All the frequency converter should be : Allen-Bradley, Dan Foss,
  11.  Guarantee of consistency for the out put mineral profile, based on the mineral profile given for feed to Ion exchange.